Manor Park Methodist Church

Manor Park Methodist Church.
New Church and Training facility.

Project Cost - £486,000.00 (Services element)

  • Description of Project

    Following a fire in the existing church the remains were demolished to allow a new building to be erected. The new building would incorporate a new Church facility at ground floor level and an independent training facility consisting of offices, seminar rooms and or acoustic music room.

    Mechanical Services include:

    • Underfloor heating
    • Ventilation systems
    • Independent cooling system
    • New hot and cold water systems
    • New Boiler Room incorporating a new BMS system and hot water plant

    Electrical Services include:

    • LV Distribution System
    • Fire Alarm System
    • Lighting and Emergency Lighting
    • Power and Data Systems
    • Security Systems
    • Lighting Protection
  • Services Provided

    Fowler Martin was appointed as the employers M&E consultant and undertook the following duties:

    • Design of the mechanical and electrical services and production of tender documents
    • Liaising with Client and End User
    • Attend design team workshops and meetings
    • Assist with Building Regulations submissions
    • Review contractor design proposals
    • Attend project progress meetings
    • Witness and sign off commissioning
  • Key Challenges

    The main challenge was to provide two independent systems for the two different occupants of the building. Due to the different use of each space the occupancy patterns did not match.

    Each End User wanted separate control of their environment, and therefore to reduce energy costs, it was imperative that the unoccupied areas should be stand alone from each other.

  • Team Integration

    Fowler Martin played a vital role as the Clients M&E consultant and ensuring the brief was met. This was achieved by continuous discussions with the design team and attending design team meetings.
  • Sustainability

    Fowler Martin is committed towards sustainability and the environment and ensures that any new design complies with Building Regulations and obtains approval's from the Local Authority.

    The design included the use of inverter driven motors, energy metering systems, high efficiency lighting, high efficiency boilers and BMS control to ensure continuous monitoring and early warning of faults.