Delivering safe, efficient and sustainable building systems since 1986.
Fowler Martin was appointed as Principal Designer for a programme of electrical improvement works at the Mullard Space Science Laboratory (MSSL) Pump House. The works included a roof replacement, electrical infrastructure upgrades and improvements to external and internal facilities, delivered within a live and operational research campus environment.
Fowler Martin was appointed by MBDA UK to develop the MEP design to RIBA Stage 3 for refurbishment and decarbonisation in Stevenage. The project combined comfort cooling, specialist process services, infrastructure upgrades and low-carbon technologies within a highly technical defence environment.
Fowler Martin was appointed to develop the detailed Stage 4 MEP design for the replacement of the existing Energy Centre serving Goldsmiths University. The project involved the renewal of ageing boiler plant and associated infrastructure that provides heating and hot water to multiple buildings across the campus.
Fowler Martin was appointed as MEP Designer and Principal Designer for the fit-out of the new Valetta Grove Library and Community Hub in Plaistow, London. The project forms part of a wider mixed-use development, creating a modern library and multifunctional community space for local residents.
Fowler Martin was appointed to deliver the Stage 4 design for the fire alarm system upgrade within Stansted Airport's Satellite 2 terminal building. The project modernised the existing fire detection infrastructure, enhancing coverage, reliability and future flexibility within a live operational airport environment.
Fowler Martin was appointed as MEP designer for the refurbishment of Abbeyfield House, transforming a disused nine-bedroom care home into a modern eleven-bedroom care facility. The project involved the complete replacement and upgrade of building services to support the client's vision for a high-quality care environment.
Fowler Martin provided mechanical and electrical engineering design services for the refurbishment and upgrade of two MRI suites at University College London's 12 Queen Square. The project involved delivering highly controlled environmental conditions to support specialist imaging equipment within a live healthcare and research environment.
Fowler Martin was appointed to provide mechanical engineering design services for the decarbonisation of the Waitrose store in Ruislip. The project focused on replacing the existing gas-fired heating system with a low-carbon air source heat pump solution, supporting the client's sustainability objectives while maintaining reliable building operation.